What size are your delivery trucks?
Our delivery trucks vary from 8-10 meters in terms of volume, and 32-44 tonnes in terms of weight. Read More
What size are your delivery trucks?
Our delivery trucks vary from 8-10 meters in terms of volume, and 32-44 tonnes in terms of weight. Read More
How is the concrete moved from the truck?
The trucks are fitted with chutes that can extend from the centre of the truck to transport the concrete to the desired location. If the chutes aren’t long enough, there are wheelbarrows to move the concrete further, or specialist concrete pumps can be used. Read More
What is the best way to lay the concrete?
For the best advice on how to lay concrete, please give the team at Neil Sullivan a call and we’ll be happy to go through this with you. Read More
How long does it take for the concrete to set?
Depending on the weather, the concrete will take roughly 28 days to cure. Read More
Concrete is measured Per meter cubed – m3. Read More